The last week of April 2024 saw another fine installation of a domestic wastewater treatment plant, the BC 4 OPTIMA, this time in the beautiful foothills of the Novohradské Mountains.
The client had the site preparation perfectly organised: before we arrived on site, the pit for the WWTP had been dug, complete with a reinforced-concrete base slab. The pit for the soakaway was ready too, with 32/63 aggregate, all carefully wrapped in 200 g/m² filter geotextile. The client did all the excavation work by hand, which we greatly admire.