Domestic WWTP Nové Hrady

The last week of April 2024 saw another fine installation of a domestic wastewater treatment plant, the BC 4 OPTIMA, this time in the beautiful foothills of the Novohradské Mountains.

Domestic wastewater treatment plants04 / 2024
Project photo: Domestic WWTP Nové Hrady View the images
Project photo

THE PROJECT IN A NUTSHELL

A specific place.
A specific solution.

Solution area
Domestic wastewater treatment plants
Project period
04 / 2024
Technology
BC 4 OPTIMA and a filter shaft
Scope of work
Installation and commissioning of a WWTP with a filter shaft upstream of the soakaway.

HOW IT WENT

From the brief
to the finished solution.

Read the full story of the project, the technology used and the individual steps.

Original reference
Prefer to talk it all through in person?+420 736 403 795
01The last week of April 2024 saw another fine installation of a domestic wastewater treatment plant, the BC 4 OPTIMA…

The last week of April 2024 saw another fine installation of a domestic wastewater treatment plant, the BC 4 OPTIMA, this time in the beautiful foothills of the Novohradské Mountains.

The client had the site preparation perfectly organised: before we arrived on site, the pit for the WWTP had been dug, complete with a reinforced-concrete base slab. The pit for the soakaway was ready too, with 32/63 aggregate, all carefully wrapped in 200 g/m² filter geotextile. The client did all the excavation work by hand, which we greatly admire.

02Once again it was confirmed to us that it pays to give customers time and communicate with them before the work begins.

Once again it was confirmed to us that it pays to give customers time and communicate with them before the work begins. Installing and commissioning the technology is then far more pleasant when everything has been professionally prepared.

The BC 4 OPTIMA used here treats the wastewater. Downstream of it is a filter shaft with a removable filter basket. The filter shaft serves as a sampling point but, above all, protects the pore space of the underground soakaway from escaping sludge in the event of a process failure at the WWTP. The soakaway is built as a gravel soakaway pit into which DN 100 drainage pipes are laid. Treated wastewater flows out of the drainage pipes into the gravel, from where it infiltrates into the subsoil.

NOW IT'S YOUR PROJECT'S TURN

A similar situation?
We'll find your way forward.

Tell us a little about the site and what you have in mind. We'll discuss the next steps together.