Installation and commissioning of a domestic WWTP BC 4 OPTIMA, Pojbuky u Pelhřimova

We supplied a BioCleaner BC 4 OPTIMA in the polypropylene (PP) version. The job included groundworks, positioning of the treatment plant, hook-up to the sewer connection and putting the equipment into operation.

Domestic wastewater treatment plants07 / 2025
Project photo: Installation and commissioning of a domestic WWTP BC 4 OPTIMA, Pojbuky u Pelhřimova View the images
Project photo

THE PROJECT IN A NUTSHELL

A specific place.
A specific solution.

Solution area
Domestic wastewater treatment plants
Project period
07 / 2025
Technology
BioCleaner BC 4 OPTIMA
Scope of work
Turnkey supply, groundworks, positioning of the treatment plant, sewer hook-up and commissioning.

HOW IT WENT

From the brief
to the finished solution.

Read the full story of the project, the technology used and the individual steps.

Original reference
Prefer to talk it all through in person?+420 736 403 795
01Not even rainy weather stopped us on our next project.
Not even rainy weather stopped us on our next project. In Pojbuky u Pelhřimova we completed the turnkey installation of a domestic wastewater treatment plant for a smaller family house.

We supplied a BioCleaner BC 4 OPTIMA in the polypropylene (PP) version. The job included groundworks, positioning of the treatment plant, hook-up to the sewer connection and putting the equipment into operation.

Although the weather was not ideal, everything went smoothly and the customer gained a reliable wastewater treatment solution. Modern BioCleaner technology ensures low running costs, quiet operation and minimal maintenance requirements.