In Chlum u Třeboně we completed a shared sewer and wastewater treatment project for two family houses.
Wastewater from the first house is piped to a pumping station, from where a pump transfers it to a BC 6 OPTIMA domestic wastewater treatment plant. The second family house is connected to the same plant via an inspection chamber.
The treated water then flows into a storage tank with an integrated submersible pump, which not only balances the flow but also acts as a safeguard should sludge escape from the plant. If necessary, the submersible pump can relieve the infiltration system by spraying the treated water over the plot.