If the installation instructions from the wastewater treatment plant manufacturer are not followed, problems can arise that a DIY builder cannot solve alone. We were contacted by the owner of a new BC 4 BASIC plant, who had bought it from an unnamed online shop, without installation or commissioning.
This is how problems often start. Without the necessary knowledge and experience, a poorly executed installation can cause irreversible damage to the tank and losses running into tens of thousands of Czech crowns.
In this case the customer did not follow the installation instructions and backfilled around a plastic tank that had not been filled with water. Within a short time the pressure of the surrounding soil deformed the tank, twisted the baffle walls, disconnected the outlet pipe and made the final settling tank “pop out” of its original position.





