We were recently approached by a client looking for a way to connect a property to the public sewer network.

Pumping stations and related technologyWWTP refurbishment and capacity upgrades08 / 2024
Project photo: Foul sewer pumping sump Bechyně View the images
Project photo

THE PROJECT IN A NUTSHELL

A specific place.
A specific solution.

Solution area
Pumping stations and related technology / WWTP refurbishment and capacity upgrades
Project period
08 / 2024
Technology
AmaPorter S 545 ND
Scope of work
Conversion of the original WWTP tank into a pumping sump, installation of a pump and an electrical distribution board.

HOW IT WENT

From the brief
to the finished solution.

Read the full story of the project, the technology used and the individual steps.

Original reference
Prefer to talk it all through in person?+420 736 403 795
01We were recently approached by a client looking for a way to connect a property to the public sewer network.

We were recently approached by a client looking for a way to connect a property to the public sewer network.

Construction of a new central wastewater treatment plant for the whole village had just been completed. The family house in question was the only one in the entire village that could not be connected to this central WWTP by gravity, owing to unfavourable gradients. Until then, the house's wastewater had been dealt with by a domestic wastewater treatment plant discharging into a soakaway.

We gladly took up the client's challenge and carried out the whole job.

02We used the existing WWTP tank to house the pumping technology.

We used the existing WWTP tank to house the pumping technology. First we had it pumped out by a vacuum tanker, then we cleaned it thoroughly with pressurised water. We carefully removed the internal process fittings from the tank and sealed the outlet pipe from the domestic WWTP. We checked the tank for leaks and prepared it to house the technology for pumping sewage into the public sewer.

The heart of the whole system is an AmaPorter S 545 ND submersible sludge pump with a cutter, rated at 1.5 kW. The pump is operated by float switches that monitor the minimum and maximum operating levels in the existing tank. Our supply also included manufacturing and fitting the electrical distribution board for this technology.

03The client's requirement was to install technology that would be reliable in operation and have a long…

The client's requirement was to install technology that would be reliable in operation and have a long service life, even at the cost of a higher purchase price. Naturally, we applaud this approach.

NOW IT'S YOUR PROJECT'S TURN

A similar situation?
We'll find your way forward.

Tell us a little about the site and what you have in mind. We'll discuss the next steps together.