As part of our servicing and refurbishment work, we modernised a BC 4 PP domestic wastewater treatment plant that had been in operation for an impressive 25 years. Likewise, the original electrical distribution board and control unit had served the whole time without being replaced. This reference project proves that even technology this old can be successfully refurbished and brought into line with current standards – without having to replace the entire plant.
THERE'S A STORY BEHIND EVERY PROJECT
A second life for an old treatment plant – technology refurbishment after 25 years of operation
As part of our servicing and refurbishment work, we modernised a BC 4 PP domestic wastewater treatment plant that had been in operation for an impressive 25 years. Likewise, the original electrical…
View the imagesTHE PROJECT IN A NUTSHELL
A specific place.
A specific solution.
- Solution area
- WWTP refurbishment and capacity upgrades / Domestic wastewater treatment plants
- Technology
- BC 4 PP
- Scope of work
- Refurbishment of the internal technology while retaining the tank, replacement of the controls and recommissioning.
HOW IT WENT
From the brief
to the finished solution.
Read the full story of the project, the technology used and the individual steps.
Original reference01As part of our servicing and refurbishment work, we modernised a domestic wastewater treatment plant…
02Smart refurbishment instead of replacement
Smart refurbishment instead of replacement
The customer did not have to invest in excavation work and the installation of a new unit. We chose a solution that made better sense both technically and financially – a complete refurbishment of the existing technology on site.
03What did we do?
What did we do?
- we kept the original plastic tank, which saved both money and time,
- we completely replaced the internal technology in line with the current EN 12566-3 standard,
- we fixed a mechanical fault caused by a foreign object in the central zone (we found a spade there),
- we replaced the non-functioning aeration elements, the air distributor and the outdated electrical distribution board with its control unit,
- we repaired the disconnected air hoses and installed a warning signal light,
- we put the system into operation, including filling it with active biological sludge.
04The result? A modern, working treatment plant without having to replace the whole technology.
The result? A modern, working treatment plant without having to replace the whole technology.
This project shows that even after 25 years an older WWTP can have new potential – all it needs is a chance and expert care. Thanks to our experience and technical facilities, we can design a tailor-made solution and bring even older types of treatment plant back to life.
05Do you have an older domestic WWTP too?
Do you have an older domestic WWTP too?
Don't hesitate to contact us – we will be happy to check its technical condition and propose a refurbishment solution that saves you time, worry and money.
UP CLOSE
Take a look at the result.
3 images · photos and illustrations
Click to open a larger view.



NOW IT'S YOUR PROJECT'S TURN
A similar situation?
We'll find your way forward.
Tell us a little about the site and what you have in mind. We'll discuss the next steps together.