The client approached us after several failed attempts at sorting out a sewage holding tank. On a plot with a high groundwater level, three different tanks had been installed one after another in the past – welded plastic, fibreglass and concrete. Every one of them failed. On top of that, the concrete tank was poorly built: it leaked, the insulation of its roof slab was badly done and the inlet had not been designed professionally.
The problems were so serious that after every rainfall the client had to call a company to pump out the tank, because it was always full. This meant that at such times he could not run any water in the building at all.